HQ-19A Surface-to-Air Missile
HQ-19A Surface to Air Missile
The HQ-19A missile family is a direct improvement on the HQ-19 missile family, a co-development project with Russia that aimed to furnish China with a missile analogous to the S-400 system.
As with most joint projects, Chinese developers immediately turned around and started fiddling with the design independent of Russian oversight.
The HQ-19A project is primarily geared towards providing the the PLAN with a new missile suite to replace the aging HQ-9 family.
 Specifically, the PLAN desires to incorporate both the HHQ-19A and MVLS systems directly into the upcoming Type 055 Destroyer. If successful, this would guarantee the PLAN's blue water expeditionary groups a first-rate air defense destroyer capable of out-performing the British Type 45 and American Arleigh Burke.
Additionally, the navalized S-400 would offer the PLAN a capability even the Russian Navy lacks.
As the S-400 family is comprised of two base missiles, the HQ-19 family will reflect that. The larger missile (40N6E) will be referred to as the HQD-19A, with 'D' being drawn from 'duoshu,' or 'majority.'
The smaller missile (9M96E2) will be referred to as HQS-19A, with 'S' being drawn from 'shaoshu,' or 'minority.'
To frustrate Western observers, the missiles will sometimes be referred to as HQDS-19, HQSS-19, HSS-19, and HDS-19 when released to the public. When referring to the navalized variant, an additional H will be injected into the initials at random (ie, HQSHS, HSSH, HDHS).
There will be no consistent usage of any of these terms in declassified documents.
In terms of direct improvements over the baseline HQ-19, the HQ-19A offers few.
The largest difference is that it is specifically (re)designed to work in tandem with the MVLS.
It is unlikely that the HQ-19A will ever see use by the PLAGF, as this project is almost exclusively a PLAN project.
The HQS-19A will be capable of being quad-packed into the MVLS-8.
The HQ-19A family possesses no substantial performance differences from the S-400. It will not be available for escort, though improved versions of the HQ-9 can be substituted in its place.
It will be available for PLAN vessels beginning in 2016. It will not be procured by other branches.